Polperro demo stage 4

Polperro demo stage 4

0.0cm x 0.0cm

Work was started along the roof line,the objective being to keep as much first wash as possible. In some areas a subtle line was all that was required, as in the gutter line between roof and wall.

Bookmark

Share this

Leave a comment